Projects with European
funding

Three investments in irrigation, machinery, cold storage, automation and solar power, with about BGN 3.79 million in public co-funding in total.

Information poster for project BG-RRP-6.004-2420-C01: Funded by the European Union, NextGenerationEU; BGN 617,850.00 total value, of which BGN 282,827.75 in grants; period 25.06.2024 – 25.06.2025

BG-RRP-6.004-2420-C01

“Investments in technological modernisation and digitalisation of Stefanov NP Ltd for sustainable agriculture”

Programme
Recovery and Resilience Facility, Sustainable Agriculture component, procedure BG-RRP-6.004
Funding
BGN 617,850.00 total value, of which BGN 282,827.75 in grants
Period
25.06.2024 – 25.06.2025
Status
Completed, results being confirmed

On 25.06.2024 STEFANOV NP Ltd signed funding contract BG-RRP-6.004-2420-C01 under the Recovery and Resilience Facility for an investment under the Sustainable Agriculture component, investment “Fund for promoting the technological and environmental transition of agriculture”. The investment will contribute to the technological and environmental upgrade of the means of production, greater competitiveness and sustainability of the farm, and faster adaptation to climate change, greener production and the digital transformation.

Information poster for project BG06RDNP001-4.015-0286-C01: European Agricultural Fund for Rural Development: Europe investing in rural areas; BGN 2,574,828.47 in public funding; period 03.08.2023 – 26.08.2025

BG06RDNP001-4.015-0286-C01

Investments in automation and environmental protection, including renewable energy, for a herb and fruit (rosehip) processing site on plot 05102.128.63, Bozveliysko, Provadia municipality, Varna region

Programme
Rural Development Programme 2014 – 2020, sub-measure 4.2 “Investments in processing/marketing of agricultural products”
Funding
BGN 2,574,828.47 in public funding
Period
03.08.2023 – 26.08.2025
Status
Completed, results being confirmed

On 03.08.2023 STEFANOV NP Ltd signed funding contract No. BG06RDNP001-4.015-0286-C01 under the call for project proposals for sub-measure 4.2 “Investments in processing/marketing of agricultural products” of measure 4 “Investments in physical assets”. With this investment Stefanov NP Ltd will achieve high economic efficiency and greater competitiveness through good use of the factors of production and by adding value to the farm produce it processes.

Information poster for project BG06RDNP001-4.012-1695-C01: European Agricultural Fund for Rural Development: Europe investing in rural areas; BGN 930,445.23 in public funding; period 27.01.2023 – 25.08.2025

BG06RDNP001-4.012-1695-C01

A drip irrigation system for lavender plantations, purchase of farm machinery and innovative equipment

Programme
Rural Development Programme 2014 – 2020, sub-measure 4.1 “Investments in agricultural holdings”
Funding
BGN 930,445.23 in public funding
Period
27.01.2023 – 25.08.2025
Status
Completed, results being confirmed

On 27.01.2023 STEFANOV NP Ltd signed funding contract No. BG06RDNP001-4.012-1695-C01 under sub-measure 4.1 “Investments in agricultural holdings” of measure 4 “Investments in physical assets”. The new farm machinery and irrigation systems will improve the farm's overall operation, lower production costs and secure steady yields and high quality. The modernisation includes innovative technology for rapid cooling and storage of essential oil crops, to preserve their most volatile compounds, and energy independence through a standalone solar installation.